1.
Nasir LM, Seriki OL, Onche E. Modification, Simulation and Demonstration of Laboratory Scale Pelton Turbine for Waterfall Hydropower Plant. AJERD [Internet]. 2023Sep.26 [cited 2024Sep.20];6(2):57-2. Available from: https://mail.journals.abuad.edu.ng/index.php/ajerd/article/view/190